Electrician Estimate Template: Copy It, Plus a Priced Example
For every trade: Contractor Estimate Template With Good, Better, and Best Options
An electrician estimate template has 11 parts, and 30 days is a common time limit
An electrician estimate template needs 11 parts: your business and license line, the customer and job address, an estimate number and date, the job in one sentence, the scope of work, three options with one total each, add-ons, the permit, what is not included, how long the price is good for, and how to say yes. Housecall Pro's HVAC estimate template says an expiration date is "typically 30, 60, or 90 days," and its sample line reads "Price valid for 30 days."
The worked example below is a 200-amp panel replacement in Ramsey, Minnesota. It comes to $1,300.03, $1,334.03, or $1,660.91, depending on which option the customer picks. The parts are Menards prices opened on November 8, 2026, the permit is the City of Ramsey's 2026 fee, and the labor rate is example arithmetic, shown step by step further down.
People search for this as an electrical estimate template, an electrician estimate template, or an electrical quote template. One template does all three. Write "Estimate" at the top when the price could change once you open a wall, and "Quote" when it is a fixed price. If it can change, say in the scope what would change it.
Copy this electrician estimate template
Fill in the brackets and delete any line that does not fit the job. Keep the three options even on small jobs, so the customer picks one instead of saying yes or no to a single number.
[Business name] · [Phone] · [Email] · [Website]
License: [license number, with any prefix your state uses] · [Business name exactly as it appears on your license]
Estimate #[number] · Date: [date] · Price good until: [date, 30 days out]
For: [Customer name] · Job address: [Street, city, ZIP] · [Customer phone and email]
The job: [One plain sentence. Example: Replace the main electrical panel in the basement.]
Scope of work: [Pull the permit.] [Set the power shutoff date with the utility.] [Remove the old panel and install the new one in the same place.] [Reconnect and label every circuit.] [Install the surge protector.] [Pass the inspection.] [Clean up and haul away the old panel.]
Pick one option:
| Option | What you get | Price |
|---|---|---|
| Good | [The job done right with a basic part, plus everything code requires] | $[total] |
| Better | [A bigger panel or a better part, the one you expect most customers to pick] | $[total] |
| Best | [Everything in Better, plus the upgrade you would put in your own house] | $[total] |
Add-ons (check any you want): [Add-on 1]: $[price] · [Add-on 2]: $[price]
Permit and inspection: [City or state], $[fee]. Included in every option above.
Not included: [Example: Drywall or plaster repair, any fee the utility charges, and problems found in the wiring once the old panel is out. We will price those before doing them.]
Payment: [Example: Paid in full when the inspection passes. Card, check, or cash.]
Warranty: [Your labor warranty, in years. The maker's warranty covers the parts.]
To approve: [Tap Approve on the estimate, or reply "yes" with the option you want.] Questions? Call or text [your name] at [phone].
Give the permit its own line, even though every option includes it. The customer sees that the work will be inspected, and you have something to point to when a cheaper bid leaves the permit out. The "Not included" line protects you on old houses: it tells the customer before you start that a surprise behind the panel gets its own price.
Three lines make an electrical estimate different: the permit, the code, and the license
The permit. Price it from your city's or state's fee schedule, not from memory. In Ramsey, Minnesota, a residential panel replacement is $125.00, plus a $1.00 state surcharge on each permit, and the city says "the permit fee is doubled if the work starts before the permit is issued" (City of Ramsey). Where the state does the inspecting, Minnesota Statutes section 326B.37 sets the fee for each reconnected circuit at $2 when an existing panelboard is replaced, and a minimum of $55 for each separate inspection.
The code. Anything the code requires goes into all three options, never into an add-on. Selling a required part as an extra makes your Good option a job that fails inspection. Minnesota adopted the 2026 National Electrical Code, effective August 17, 2026 (Minnesota Department of Labor and Industry). The department's 2026 NEC FAQ, revised October 5, 2026, says surge protection is now required for new installations "as well as replacement distribution equipment" in dwelling units, with a Type 1 or Type 2 device rated at least 10kA. So in Minnesota, every panel replacement option carries a surge protector. Other states adopt different editions on different dates. Ask your inspector which one applies before you price.
The license. Some states say what an estimate must show:
- Texas. The TDLR electricians compliance guide says the contractor's name, address, phone number, and license number must be on "all proposals, invoices, and written contracts."
- Minnesota. Rule 3800.3560 says the contractor's name "as it appears on the contractor's license" must be on any advertisement or printed matter that offers licensed electrical work.
Other states have their own rules, so ask your licensing board. Putting the license line on every estimate costs nothing, and it is the same line your invoice needs. Our electrician invoice template picks up where this estimate leaves off.
Give good, better, and best options on every electrical estimate
One price asks the customer "yes or no." Three options ask "which one," which is an easier question, and it keeps the customer comparing your options instead of your price against the next electrician's.
How to build the three:
- Good is the job done right with a basic part, plus everything the code requires.
- Better is the one you expect most people to pick: more room, a better part, or a longer warranty.
- Best adds the upgrade you would want in your own house.
Rules that keep the options honest:
- Each option is a whole job with one total. The customer never needs a calculator.
- Say what changes in a few words: "10 more spaces," "adds arc-fault breakers on bedroom circuits."
- Keep add-ons separate. An option is the main job. An add-on is something any option can take, like an outdoor outlet.
- Stop at three. Three options fit on a phone screen.
Options for common residential jobs:
| Job | Good | Better | Best |
|---|---|---|---|
| Panel replacement | 30-space panel | 40-space panel, room to add circuits | 40-space panel and arc-fault breakers on bedroom circuits |
| Outlet that keeps tripping | Replace the outlet | Replace it with a GFCI outlet | GFCI outlet, and test every outlet on that circuit |
| Ceiling fan | Hang the customer's fan on a fan-rated box | Replace the box with a fan-rated one, then hang the fan | New fan-rated box, the fan, and a wall control |
| Outdoor light | One fixture on the existing switch | Fixture with a dusk-to-dawn sensor | Two fixtures with motion sensors |
These are examples, not a price list. Price each option from your own costs, using the labor math below.
A worked example: a 200-amp panel replacement in Ramsey, Minnesota
Sarah M. has an old 200-amp panel with no open spaces, and she wants a heat pump next year. Dave, an electrician who works alone, looks at the basement and writes the estimate the same afternoon. The parts are real prices, and so is the permit. The labor hours, the $95 rate, and the $60 for fittings are example numbers to show the arithmetic.
Parts and permit, priced November 8, 2026:
| Line | Price |
|---|---|
| Square D Homeline 200-amp, 30-space panel with five breakers (HOM3060M200PCVP) | $234.00 |
| Square D Homeline 200-amp, 40-space panel with five breakers (HOM4080M200PCVP) | $268.00 |
| Square D Homeline Type 2 surge protector (HOM2175SB) | $120.03 |
| Square D Homeline 20-amp arc-fault breaker (HOM120PCAFIC) | $57.97 each |
| Legrand radiant 20-amp weather-resistant GFCI outlet (2097TRWRWCCD4) | $25.20 each |
| TayMac in-use outdoor outlet cover (MM420C) | $8.49 |
| City of Ramsey residential panel replacement permit, with $1.00 state surcharge | $126.00 |
The Menards prices are the shelf prices its website showed for one store that day, before any mail-in rebate. Your supply house will differ, so price from your own receipts.
The three options Sarah sees:
| Option | What Sarah gets | Price |
|---|---|---|
| Good | 30-space panel, surge protector, permit, 8 hours of labor | $1,300.03 |
| Better | 40-space panel with 10 more spaces for the heat pump, surge protector, permit, 8 hours | $1,334.03 |
| Best | Everything in Better, plus arc-fault breakers on four bedroom circuits, 9 hours | $1,660.91 |
Add-ons (check any you want): Weather-resistant GFCI outlet with an in-use cover, replacing the one by the back door: $81.19 · GFCI outlets in both bathrooms: $145.40
Not included: Drywall repair, any fee the utility charges, and problems found in the wiring once the old panel is out.
Check the math:
- Good: $234.00 panel + $120.03 surge protector + $60.00 fittings + 8 hours x $95 ($760.00) + $126.00 permit = $1,300.03.
- Better: the same, with the $268.00 panel = $1,334.03.
- Best: Better + 4 breakers x $57.97 ($231.88) + 1 more hour ($95.00) = $1,660.91.
- Outdoor outlet: $25.20 + $8.49 + half an hour ($47.50) = $81.19.
- Bathrooms: 2 x $25.20 + 1 hour ($95.00) = $145.40.
Better costs $34.00 more than Good for 10 more spaces, enough room for Sarah's heat pump. That gap is the point of the three options: Sarah can see exactly what each step up buys. The surge protector is in all three because Minnesota requires it on a replacement panel. Round the totals if you like round numbers, and do it on every option.
How to price labor: start at the $30.38 median wage and work up
The labor rate on an estimate is not the wage. It has to carry the wage, the cost of employing someone, the hours nobody pays for, and your overhead and profit. The Bureau of Labor Statistics puts the median pay for electricians at $30.38 an hour, or $63,190 a year, in May 2025. Here is one way to build a rate from it. Every number after the wage is an example.
- Wage. A journeyman at the median, $30.38 an hour.
- Cost to employ. Payroll taxes, workers' comp, and benefits ride on every hour. In June 2026, wages were 70.0% of total compensation for private industry workers. So $30.38 ÷ 0.70 = $43.40 an hour.
- Hours nobody pays for. Driving, the supply house, and writing estimates are paid hours you can't bill. If 6 of 8 paid hours are billable, each billable hour carries $43.40 x 8 ÷ 6 = $57.87.
- Overhead and profit. The van, insurance, tools, your phone, and the profit that lets you grow. Adding 60% gives $57.87 x 1.6 = $92.59. Round to $95, the rate in the worked example.
If you work alone, do the same math with the pay you want for yourself, the self-employment tax you pay, and your own billable hours.
Price the parts at your cost or with a markup you choose, and stay consistent. The worked example bills parts at the store price to keep the arithmetic easy to follow. Many electricians show the customer one flat price per option and keep the hours on their own copy. Either way, write the hours down, so you can tell which jobs pay. When your costs go up, our guide to how to raise your prices shows how many customers you can afford to lose.
Sam is the AI office manager that never sleeps.
He books jobs, sends invoices, and answers your customers, all by text. He checks with you before anything goes out.
Free plan, no credit card. Sam answers new customers on Pro. Or text (833) 365-7267.
Hi, I'm Sam. Text me what you need done and I'll take care of it.
How do I get started?
How long an electrical estimate is good for: 30 days, written as a date
Put a date on every estimate, not a number of days. "Price good until December 8, 2026" leaves nothing to count. Housecall Pro calls 30, 60, or 90 days typical. That is common practice, not a law, so you pick the window.
How to pick it:
- 30 days suits most service and repair work. It gives the customer time to talk it over while your part prices still hold.
- Shorter, like 14 days, when a big share of the price is a part that is on sale or changes often. The Menards prices in the example above are one day's prices.
- Longer, like 60 days, for a larger job a customer has to save for, if you are sure of your prices.
If the permit fee or code edition is about to change, say so in the scope. Ramsey's fee sheet is for 2026, and Minnesota's code changed on August 17, 2026. An estimate written across a change like that should name which rules it was priced under.
When a customer comes back after the date, don't refuse the job. Check your costs and send a new estimate. If nothing changed, send the same prices with a new date.
Check the FTC's 3-day cancel rule before you sell at the kitchen table
The FTC's Cooling-Off Rule lets a customer cancel some sales made in their home until midnight of the third business day after the sale. Saturdays count as business days. Sundays and federal holidays don't. The rule does not cover home sales under $25, so nearly every electrical job is big enough.
Two exceptions matter most to electricians:
- Repairs the customer asked for. If the customer called you to fix something, that repair is not covered. The FTC says items bought beyond that request are covered.
- Sales made entirely online, by mail, or by phone.
So if Sarah called Dave about a breaker that keeps tripping, and he sold her the panel replacement standing in her basement, that panel sale may be covered. When the rule applies, the FTC says the seller must give the customer two copies of a cancellation form and a dated copy of the contract or receipt that explains the right to cancel.
Sending the estimate after you leave, and letting the customer decide from their own phone, is a cleaner way to sell bigger work anyway. Some states add their own rules for home improvement contracts. This is not legal advice, and a lawyer in your state can tell you what applies to your jobs.
Follow up on day 3 and day 7 when the customer goes quiet
A quiet customer may be busy, waiting on a spouse, or may have lost the message. A short follow-up makes answering easy.
- Same day. Send the estimate before you leave the driveway.
- Day 3. A short text or call to check they got it.
- Day 7. A reminder of the date the price is good until.
- After the date. One last note offering a new estimate. Then stop.
Copy these and fill in the brackets.
Day 3
Hi [Name], it's [Your name] at [Business]. Checking that you got the estimate for [job]. Happy to answer questions or change an option. Reply here or call [phone].
Day 7
Hi [Name], a reminder that the prices on your [job] estimate are good until [date]. If you'd like to go ahead, tell me which option and I'll get the permit started.
After the date
Hi [Name], the estimate for [job] ran out on [date]. If you still want it done, I'm glad to check prices and send a new one.
Call instead of texting on a big job like a panel, or when the customer called you first. Ask one plain question: "Did one of the options look right, or should I change something?" If the answer is no, thank them and ask what would have made it a yes.
If you keep losing estimates to cheaper bids, the fix is often more of the right calls, not a lower price. Our guides to electrician leads and electrician marketing cover where those calls come from.
Where ServicePro fits
Every ServicePro business, on Free or Pro, can send estimates with options and add-ons. The customer opens the estimate on their phone, picks Good, Better, or Best, checks the add-ons they want, and approves, with no login. An estimate with no answer after 3 days shows on your Today screen, so you know who to call. ServicePro has no e-signature, no photos on estimates, and no expiry date, so put the "good until" date in your message.
When the job is done, send the invoice, and the customer pays by card through a pay link, or scans the pay link's QR code to pay on the spot. The Free plan is $0, with no card, and builds a website from your Google Business Profile with a booking page where customers request a time. On every plan you can make a QR code for that booking page or your website to put on your cards, door hangers, and truck, and one for your Google review page to show the customer when the job is done. Pro is $99 a month with no contract and adds a toll-free number that forwards to your cell. Get the free website
How this post was made: drafted with AI from the sources linked on this page. Figures and links were checked on November 8, 2026.
Frequently Asked Questions
What should an electrician estimate include?
An electrician estimate needs 11 parts: your business and license line, the customer and job address, an estimate number and date, the job, the scope of work, three options with one total each, add-ons, the permit, what is not included, a date the price is good until, and how to approve. Housecall Pro calls 30, 60, or 90 days typical for that date, and 30 days suits most electrical work.
How long is an electrical estimate good for?
You choose. Housecall Pro says an estimate's expiration is typically 30, 60, or 90 days, and no law sets it. Thirty days suits most service and repair work. Use a shorter window when a big part of the price is a part on sale, and write the actual date, such as "Price good until December 8, 2026," so the customer has nothing to count.
What does a 200-amp panel replacement estimate come to?
In this post's worked example in Ramsey, Minnesota, the three options come to $1,300.03, $1,334.03, and $1,660.91. That uses Menards part prices from November 8, 2026, Ramsey's $125 panel permit plus the $1 state surcharge, and an example labor rate of $95 an hour for 8 or 9 hours. It is arithmetic to copy, not a market price, so use your own costs.
How do electricians price labor on an estimate?
Start from the wage and work up. The Bureau of Labor Statistics puts the median electrician wage at $30.38 an hour for May 2025. Divide by 0.70, because wages were 70.0% of total compensation in June 2026, then add for unbilled hours and for overhead and profit. With 6 billable hours in 8 and 60% added, that example reaches $92.59, rounded to $95.
Is an electrical quote template different from an estimate template?
No, the same template works for both. Write "Quote" at the top when the price is fixed, and "Estimate" when it could change once you open a wall, then say in the scope what would change it. Either way, include the 11 parts: business and license line, customer, number and date, job, scope, three options, add-ons, permit, exclusions, a good-until date, and how to approve.
Does a panel replacement estimate need a surge protector?
In Minnesota, yes. Minnesota adopted the 2026 National Electrical Code effective August 17, 2026, and its Department of Labor and Industry says surge protection is required on replacement distribution equipment in dwelling units, with a Type 1 or Type 2 device rated at least 10kA. Put it in every option, not in an add-on. Other states use other code editions, so ask your inspector.
Can a customer cancel an electrical job they agreed to at home?
Sometimes. The FTC's Cooling-Off Rule lets a customer cancel many home sales of $25 or more until midnight of the third business day. A repair the customer called you to do is not covered, but extra work you sell beyond that request is. When the rule applies, give two copies of a cancellation form and a dated copy of the contract.

