Contractor Contract Template: 17 Clauses to Copy
A contractor contract needs 10 clauses, plus 7 for changes, permits, roofs, and payments
A contractor contract template needs 10 core clauses: the parties, the work, the price and payment terms, the schedule, cancellation, weather and access, property damage, materials, insurance, and signatures. Remodelers, handymen, and roofers add seven more: change orders and hidden damage, permits, allowances, hourly work, roofing and insurance claims, the deposit and payment schedule, and warranty and cleanup. If you sign the customer at their home, the FTC's Cooling-Off Rule gives them until midnight of the third business day to cancel many sales of $25 or more.
Copy each block into your own document, fill in the brackets, and delete the clauses you don't need. The note under each clause explains it.
This is not legal advice. It is a starting point, checked against the pages linked here on November 8, 2026. State rules on licenses, deposits, cancellation, and required notices differ, so have a lawyer in your state read your final version once, then reuse it on every job.
Clauses 1 to 3 say who agreed, what you will build, and what it costs
1. Parties
Construction Agreement This agreement is between [Business name], [business address], [phone], [email], license #[number, if your state issues one] ("we"), and [Customer name], [job address], [phone], [email] ("you"). Date: [date]
Plain words: name both sides and the property. Use the job address, which may not be where the customer gets mail. California's Contractors State License Board (CSLB) says the contract should identify the contractor, their business address, and contractor license number.
2. The work
We will do the following work at the job address: - [Example: Remove the existing hall bathroom tub, tile, and vanity, down to the studs.] - [Example: Install a Brand X 60-inch acrylic tub, model 123, white, and Brand Y wall tile, 3 by 6 inch, white, to the ceiling.] This is a one-time job. It is done when every item above is complete and we have walked it with you. Not included: [Example: electrical work, drywall outside the bathroom, moving the toilet drain.]
Plain words: CSLB gives this good example, "Install Brand X kitchen faucet in style ABC and color BCS," and this weak one, "Replace kitchen fixtures." The "Not included" line stops free work. Copy the lines from your contractor estimate word for word.
3. Price and payment terms
Total price: [$amount], for the work in clause 2 and the materials in clause 8. Payment: as set out in clause 16. Each payment is due [on the day the stage is done / within [number] days of the invoice]. We accept [card through a pay link, check, cash]. If a payment is more than [number] days late, we may stop work until the account is paid.
Plain words: CSLB says the job must be completed for the agreed-upon contract price unless a written change order (clause 11) changes it. For hourly handyman work, use clause 14 in place of a total price.
Clauses 4 to 6 cover the schedule, canceling, and weather and access
4. Schedule
Start date: [date]. We expect to finish by [date], about [number] working days. Days lost to weather (clause 6), a late inspection (clause 12), or a change order (clause 11) move the finish date by the same number of days. This agreement ends when the work is done and paid for.
Plain words: CSLB lists "when the job will begin and end" among the details a contract should have.
5. Cancellation
Either of us may cancel before work starts with written notice by text, email, or letter. If you cancel after we have ordered materials for your job, you pay for those materials and we deliver them to you. After work starts, you pay for the work done to that day.
If you sign the contract at the customer's home, add this sentence next to the customer's signature, in bold type of at least 10 points:
You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right.
Plain words: the bold sentence follows the wording in the FTC's regulation, 16 CFR 429.1, which also sets the 10-point bold type and the spot next to the buyer's signature. Attach two copies of the Notice of Cancellation form printed in the same regulation, filled in with your name, address, and the date.
6. Weather and access
We don't do outside work in rain, high wind, or temperatures below what the material maker allows. A day lost to weather moves the schedule (clause 4) and costs you nothing. You will give us access to the work area, power, and water from [time] to [time] on work days, and a place to park [and put a dumpster]. If we arrive on a scheduled day and can't get in, we may bill [$amount] for the trip.
Plain words: pointing the weather line at the maker's limits keeps it right for shingles, paint, or concrete.
Clauses 7 to 10 cover damage, materials, insurance, and signatures
7. Property damage
We protect floors, furniture, landscaping, and fixtures near the work, and we will repair or pay for damage we cause. Please tell us within [7] days of the walk-through and send a photo. We are not responsible for damage that comes from conditions we could not see before work started, such as rot, old wiring, or failing plumbing inside walls. Those are handled under clause 11.
Plain words: own what you break, with a time limit.
8. Materials
We will use: [Example: Brand X architectural shingles, line Y, color Z; Brand X synthetic underlayment]. [We supply all materials, included in the price / You supply the items listed in clause 13, and we supply everything else.] Materials stay our property until they are paid for. We take away our trash and leftover materials [daily / at the end of the job].
Plain words: name the brand, model, and color. CSLB says the contract should be as specific as possible about materials, such as the style, brand, model, quality, quantity, and it says to ask for any written warranties from the makers of materials the contractor installs.
9. Insurance
We carry general liability insurance of [$1,000,000] per occurrence [and workers' compensation insurance for our employees]. We will send you a certificate of insurance before work starts, on request.
Plain words: CSLB says workers' compensation is required by law if the contractor has employees in California. If you work alone, delete that part. The insurance section below has what the policies cost.
10. Signatures
By signing, we both agree to the terms above and any attached pages. [Business name]. Signed: ____________ Name: ____________ Date: ________ Customer. Signed: ____________ Name: ____________ Date: ________
Plain words: each side keeps a signed copy. When the 3-day rule applies, the FTC says the customer gets a dated copy of the contract and two copies of a cancellation form at the time of sale.
Remodelers and handymen add clauses for changes, permits, allowances, and hourly work
Add these after clause 10.
11. Change orders and hidden damage
Any change to the work or the price needs a written change order that we both sign before the changed work starts. It states the added or removed work, the new price, and any change to the finish date. If we open a wall, floor, or roof and find rot, water damage, mold, or work that isn't to code, we will stop, show you, and price the repair on a change order. We won't charge for it without your written yes.
Plain words: CSLB says a contract price can change only through a written change order that becomes a part of the contract. A text that says "Yes, replace the subfloor for $640" beats a memory.
12. Permits and inspections
[We / You] will get the building permits this job needs. Permit fees are [included in the price / billed at cost]. We will schedule the inspections. Work that must be inspected stays open until it passes.
Plain words: say who pulls the permit and who pays for it. CSLB says the contract needs written direction as to who will get the necessary permits, and its contract checklist asks whether the permit fees are in the price.
13. Allowances and selections (remodels)
The price includes these allowances: [Example: tile, $6 per square foot; vanity and top, $900; light fixtures, $400]. If your pick costs more, you pay the difference plus [number]% for handling. If it costs less, we credit the difference on the final invoice. Please choose each item by [date].
Plain words: an allowance prices the tile the customer hasn't picked yet.
14. Hourly work (handyman jobs)
For work billed by the hour: [$rate] an hour per worker, with a minimum charge of [$amount] per visit, plus materials at [cost / cost plus [number]%]. We will tell you before the job passes [number] hours or [$amount].
Plain words: Housecall Pro's handyman pricing guide, updated October 21, 2026, puts self-employed handymen at $50 to $80 an hour and suggests a minimum service fee of $125 to $200. Our handyman business plan works out a rate from your own costs.
Roofers and every trade add clauses for insurance claims, payments, and warranty
15. Roofing and insurance claims (roofers)
Tear-off: we remove [number] layers of roofing down to the deck. Decking: replacing damaged deck boards costs [$amount] per sheet. We will show you the damage before we replace any. If you plan to pay with insurance proceeds: we will not pay, waive, or rebate any part of your insurance deductible. The price in clause 3 is based on the damage we can see today. If your insurer denies the claim in whole or in part, you may cancel this agreement within 72 hours after you get the insurer's written denial. You may also cancel within 72 hours after signing this agreement for a full refund of your deposit. We hold any payment you make in trust until we deliver roofing materials to your home or finish most of the roofing work.
Plain words: price bad deck sheets up front, since nobody sees them until tear-off. The insurance, cancel, and trust lines follow Colorado's law, covered below. Outside Colorado, check your state's roofing rules before you keep them. The roofing estimate template has the line items.
16. Deposit, payment schedule, and lien releases
Deposit: [$amount] due at signing. Payment schedule: - [$amount] when [demolition and rough-in are done and inspected]. - [$amount] when [cabinets, fixtures, or the new roof are installed]. - [$amount] when the work is done and we have walked it with you. We will give you a list of our subcontractors and suppliers, and a lien release from each when their part is paid.
Plain words: CSLB says a California home improvement contract must have a payment schedule and that payments cannot exceed the value of the performed work. It tells owners to get lien releases from subcontractors, so offer them first. Our contractor invoice template shows how to bill each stage.
17. Warranty and cleanup
We warrant our labor for [1 year] from the finish date. If something we built fails because of our work, we will fix it at no charge. The warranty does not cover normal wear, damage from storms, settling, or misuse, or items you supplied. Materials are covered by the maker's warranty, and we will give you those papers. At the end of the job we remove all debris and leave the work area broom clean.
Plain words: CSLB says the contract should specify which parts of the work are covered and the duration of the warranty, and it should include "complete cleanup and removal of debris."
Sam is the AI office manager that never sleeps.
He books jobs, sends invoices, and answers your customers, all by text. He checks with you before anything goes out.
Free plan, no credit card. Sam answers new customers on Pro. Or text (833) 365-7267.
Hi, I'm Sam. Text me what you need done and I'll take care of it.
How do I get started?
The FTC's 3-day rule covers many contracts signed at the customer's home
The Cooling-Off Rule gives a customer until midnight of the third business day after the sale to cancel certain sales made at their home, and it covers home sales of $25 or more. Saturdays count as business days. Sundays and federal holidays do not. After a cancellation, the seller has 10 days to refund the money.
How it plays out for a contractor:
| How the deal was made | Does the rule apply |
|---|---|
| You sign the contract at the customer's kitchen table | Yes, if $25 or more and no exception fits |
| The customer agrees entirely by phone, by mail, or online | No, these sales are excluded |
| You finish the deal at your own shop or office | No, sales completed at the seller's permanent place of business are excluded |
| A sale needed to meet an emergency | Excluded |
| The customer asked you over to repair or maintain their personal property | Excluded, but anything you sell beyond that request is covered |
When the rule applies, the FTC says you must tell the customer about the right to cancel, give them two copies of a cancellation form, and give them a dated contract or receipt. The form in 16 CFR 429.1 begins: "You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date."
On a deal signed at the house, wait until the cancel period passes before you order special materials.
California caps deposits at $1,000 and requires a contract over $500
California's rules make a good checklist even if you work elsewhere. From CSLB pages opened November 8, 2026:
- Written contract. Required for all home improvement projects over $500, labor and materials together.
- Deposit. No more than $1,000 or 10 percent of the contract price, whichever is less, and "There are no exceptions for special order materials."
- Lien warning. Contractors must give the customer a "Mechanics Lien Warning" notice.
- Right to cancel. The buyer gets 3 business days, or 5 if the buyer is 65 or older, and the contractor returns any money within 10 days of the cancel request. The right doesn't apply when the contract is negotiated at the contractor's place of business, or to an emergency service and repair contract once work begins.
- Handyman limit. Since January 1, 2025, an unlicensed person may take a job only if the total is up to $1,000, it needs no building permit, and they hire no workers.
Example arithmetic for three California jobs, with example prices:
| Job price | 10% of the price | Largest deposit allowed |
|---|---|---|
| $4,000 | $400 | $400 |
| $9,000 | $900 | $900 |
| $25,000 | $2,500 | $1,000 |
On the $25,000 job, the other $24,000 is paid in stages as the work gets done, which is what clause 16 sets up. In California, write 5 days into clause 5 for a customer 65 or older.
Florida, Colorado, and the EPA add notices for liens, roof claims, and lead
Three more rules, checked November 8, 2026:
Florida lien notice. Any direct contract greater than $2,500 between an owner and a contractor for a home of up to four units must include the construction lien notice in Florida Statutes 713.015. It goes on the front page of the contract or a separate page, in at least 12-point capitalized bold type, and the owner signs and dates it. It begins:
ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY.
Copy the rest of the notice from the statute.
Colorado roofing contracts. Before roofing work starts, C.R.S. 6-22-103 requires a written contract signed by both sides with the scope, materials, approximate dates and costs, your contact details, your insurer, and a right to rescind within 72 hours of signing for a full deposit refund. When the job is paid with insurance money, the contract must say you won't pay, waive, or rebate the deductible, and a bold statement must say you hold the customer's payment in trust until materials are delivered or most of the work is done. The owner may also cancel within 72 hours of the insurer's written denial, and you refund within 10 days, less work already done. A roofer who promises to cover the deductible can be sued by the owner or the insurer.
Lead-safe work in homes built before 1978. The EPA says anyone paid to disturb paint in housing built before 1978 must be certified, and "This includes all firms, even sole proprietorships." Work that disturbs six square feet or less per room inside, or 20 square feet or less outside, is exempt, but window replacement is always covered. Before work, give the owner the Renovate Right pamphlet and get a written acknowledgment, or mail it at least seven days ahead, and keep the record for 3 years. Put the year the house was built in clause 2.
Insureon puts general liability for contractors at a median $162 a month
Clause 9 promises a certificate of insurance, so carry what it says. Insureon, an online insurance agency, publishes what general contractors who buy through it pay. These are monthly median figures from its general contractor cost page, updated July 31, 2026.
| Policy | Per month |
|---|---|
| General liability | $162 |
| Business owner's policy | $125 |
| Workers' compensation | $196 |
| Commercial auto | $287 |
| Builder's risk | $136 |
| Tools and equipment | $42 |
Insureon lists the average general liability limits for contractors at $1 million per occurrence and $2 million aggregate, which is why clause 9 uses $1,000,000 as its placeholder. Get your own quote before you fill in clause 9.
Where ServicePro fits
ServicePro is home services software. It has no contracts feature and no e-signature, so sign this template on paper or in your own document. ServicePro handles the work around it: estimates with options and add-ons that the customer approves on their phone with no login, a schedule for jobs and crew, invoices, card payments through a pay link with a QR code the customer scans to pay, and review requests after the job.
The Free plan is $0 with no card and builds a website from your Google Business Profile, with five service pages and a booking page where customers request a time. Print a QR code for that booking page for your yard signs and truck. Pro is $99 a month with no contract and adds a toll-free number that forwards to your cell, two-way texting after carrier verification, unlimited service pages, and 25 town pages. Get the free website
How this post was made: drafted with AI from the sources linked on this page. Figures and links were checked on November 8, 2026.
Frequently Asked Questions
What should a contractor contract include?
A contractor contract should include 10 core clauses: the parties, the work, the price and payment terms, the schedule, cancellation, weather and access, property damage, materials, insurance, and signatures. Remodelers, handymen, and roofers add seven more: change orders and hidden damage, permits, allowances, hourly work, roofing and insurance claims, the deposit and payment schedule, and warranty and cleanup. Name the brand, model, and color of every material.
Does the FTC 3-day cooling-off rule apply to contractors?
It can. The FTC's Cooling-Off Rule lets a customer cancel many sales of $25 or more made at their home until midnight of the third business day. A remodel contract signed at the kitchen table may be covered. Sales made entirely by phone, mail, or online, at your place of business, or for an emergency are not. When it applies, put the bold cancel notice next to the signature.
How much deposit can a contractor take?
It depends on the state. In California, CSLB says the down payment on a home improvement job can't be more than $1,000 or 10 percent of the contract price, whichever is less, with no exception for special order materials. On a $9,000 job that is $900, and on a $25,000 job it is $1,000. Later payments can't run ahead of the work done.
Does a contractor need a written contract?
Often, yes, by state law. California requires a written contract for any home improvement job over $500 in labor and materials. Florida requires a construction lien notice in residential contracts over $2,500, and Colorado requires a signed written contract before any roofing work starts. Even where no law requires one, a written contract with the work, price, and change order rules stops most disputes.
What is a change order in a construction contract?
A change order is a short written addition to the contract that both sides sign before extra or different work starts. It states the added or removed work, the new price, and any change to the finish date. California's CSLB says a contract price can change only through a written change order. Clause 11 of this 17-clause template also covers rot or damage found once work starts.
Can a roofer waive my insurance deductible?
Not in Colorado. C.R.S. 6-22-105 says a roofer paid from an insurance claim may not advertise or promise to pay, waive, or rebate any part of the deductible, and the owner or insurer can sue a roofer who does. Colorado also lets the owner cancel within 72 hours of the insurer's written denial. Other states have their own rules, so check yours.
Is this contractor contract template legal advice?
No. The 17-clause template is a starting point from a software company, checked against FTC, California, Florida, Colorado, and EPA pages on November 8, 2026. State rules on licenses, deposits, cancellation, and required notices differ. Fill in the brackets, delete what doesn't apply, and have a lawyer in your state read your final version once before you reuse it on every job.

